4 November 2026 · Copper procurement · 9 min read · The MetalAlert team

Should I Lock In Copper Prices Now for 2027, or Buy at Spot?

For most manufacturers the answer is neither extreme. Locking in all of your 2027 copper now makes sense only if you have already sold your products at fixed prices for 2027 and cannot pass copper increases on. Buying everything at spot makes sense only if you can pass copper changes through to customers quickly and your budget can absorb a swing of several thousand dollars per tonne. Everyone in between is usually better served by fixing a defined share of 2027 volume now, concentrated in the first half of the year, and adding further tranches on a pre-agreed schedule or set of triggers.

Bundles of industrial copper tubing stacked together
Image: jeannie70 / Pixabay

That is a framework, not a tip. Nobody knows where copper will trade in 2027, and the professional forecasts published in October 2026 are unusually far apart. The right decision depends less on predicting the price than on how much an adverse move would hurt your business compared with what it costs to remove that risk. This article sets out how to weigh those things, using current market conditions as context. MetalAlert estimates the probability of specified LME copper price changes over defined horizons, which is the kind of input this decision needs; the illustrative probabilities below are from a simple textbook model, not MetalAlert estimates.

This article is general information, not investment or financial advice. Decisions about fixing prices or using derivatives should be made with your finance team and, where relevant, your bank and auditors.

Where copper stands going into 2027

As of 3 November 2026, LME three-month copper was trading around US$14,160 per tonne, a little below the record highs set in September 2026. That is historically expensive copper, which makes many buyers reluctant to fix. Whether it is expensive relative to where prices will be in 2027 is exactly what forecasters disagree on.

The forecasts disagree

These views are not contradictory as much as they weigh different things. Goldman's deficit is outside the United States, where more than a million tonnes of copper have been pulled into US stocks; the ICSG balance is global.

The US tariff wild card

A proposed US tariff on refined copper, 15% from 1 January 2027 rising to 30% in 2028, was still undecided as of mid-October 2026, with Macquarie's base case that the January deadline passes without a decision. US exchange and off-exchange stocks were estimated at about 1.6 million tonnes. In August, Société Générale estimated that COMEX pricing implied only around a 15% probability of the 15% tariff taking effect in January 2027. Either outcome could move LME prices: a tariff decision could pull more metal into the US, while a clear "no" could release US stocks back to the world market. That two-sided risk is one reason to avoid an all-or-nothing position.

What locking in actually costs

"Locking in" is not free, and it is rarely done at today's spot price. Four elements determine what you pay.

The forward curve. A 2027 fixed price is based on LME forward prices for 2027, not on today's cash price. In October 2026 the LME curve was in backwardation, with cash about US$180/t above three-month; in August the cash-to-three-month spread reached US$434/t, the widest since 2021. In backwardation, forward prices are lower than spot, so fixing for 2027 can mean fixing below today's cash price. That looks attractive, but a backwardation reflects tight nearby supply, not a market forecast that prices will fall. Ask your supplier or bank for the forward price for each 2027 delivery month before deciding.

The supplier's or bank's margin. A supplier quoting a fixed 2027 price is hedging its own risk and adds a margin for that, plus financing. A bank swap includes a spread. Compare quotes for the same tonnage, months and price reference on the same day.

Credit and collateral. A bank swap or LME position may need a credit line or collateral. If copper falls after you fix, the hedge shows a loss that may require cash before your cheaper physical copper shows up in the accounts.

What is not covered. Fixing the LME price does not fix the physical premium (Aurubis set a record 2027 European premium of US$347/t), fabrication charges or, if you budget in EUR or SEK, the exchange rate. See hedging copper bought in USD against a EUR or SEK budget.

Think in probabilities, not a single forecast

A point forecast, such as "copper will average US$15,400 in 2027", tells you little about risk. What matters for a fixing decision is how likely a move large enough to hurt you is, in each direction, over your horizon.

To illustrate the scale of uncertainty, the table uses a deliberately simple model: prices follow a lognormal distribution centred on US$14,400/t with an assumed annual volatility of 25%. This is a textbook assumption for illustration, not a forecast, and it ignores the forward curve, fundamentals and the fact that real price changes have fatter tails than the model assumes.

Horizon Probability price is above US$16,400 Probability price is below US$12,400 Probability price stays within ±US$2,000
6 months about 23% about 20% about 57%
12 months about 30% about 27% about 43%

Even in this neutral model, there is a better-than-even chance that copper is more than US$2,000/t away from today's level in 12 months. The question for a buyer is not "will it go up?" but "which of those two tails can I afford to be caught by?"

A real forecasting system can improve on this by conditioning probabilities on current market information and, crucially, by being evaluated on whether its stated probabilities match observed frequencies (calibration). That is the difference between a useful probability and a guess dressed up as one.

A decision framework for 2027 volumes

Work through these questions for each product line or customer segment, not just the company total.

Question Points towards fixing more Points towards fixing less
Have you sold 2027 output at fixed prices? Yes, significant fixed-price contracts No, or contracts have copper clauses
Can you pass copper changes on? Slowly or not at all Quickly, via surcharges or price clauses (back-to-back pricing)
How sensitive is margin to copper? Copper is a large share of cost; margins thin Copper is a small share of cost
How certain is 2027 volume? Firm orders or stable demand Volatile or project-dependent demand
What do competitors do? Competitors fix, so a rise hurts you alone Competitors float, so a fall would let them undercut you if you have fixed
Cash and credit headroom Ample Tight; collateral calls would strain liquidity

The competitor point is often overlooked. If your competitors buy at spot and copper falls, a fully fixed position leaves you with higher costs than the rest of your market. Hedging protects you against the market, but it can expose you relative to competitors.

Illustrative outcomes: spot, half-fixed, fully fixed

Illustrative only. A manufacturer needs 500 t of copper across 2027. A 2027 fixed price of US$14,300/t is assumed; a real quote depends on the forward curve, supplier margin and credit terms. Costs below cover the LME metal element only.

2027 average LME price Buy all at spot Fix 50%, rest at spot Fix 100%
US$12,400/t US$6.20m US$6.675m US$7.15m
US$14,400/t US$7.20m US$7.175m US$7.15m
US$16,400/t US$8.20m US$7.675m US$7.15m
Range of outcomes US$2.0m US$1.0m None

Fixing everything removes all variation but costs US$950,000 more than spot if prices fall to US$12,400. Buying at spot saves that money in the low case but costs US$1.05 million more than fixing in the high case. Half-fixing halves the range. Which column is "right" depends on which outcome your business can least afford, not on which one turns out cheapest with hindsight.

The layered approach

A layered (or rolling) approach fixes portions of future volume at several points in time rather than making one large decision. In treasury practice, a layered programme typically hedges increasing proportions of exposure as it comes closer, and analysis of rolling programmes found that hedging early and layering hedges over time smoothed results.

For 2027 copper, a layered approach could look like this:

  1. Now: fix a defined share of first-half 2027 volume (for example 30-50%), where volume is most certain and any fixed-price sales are already committed.
  2. Each quarter: add a further tranche for the following periods, so that coverage for each month rises as it approaches.
  3. Triggers: agree in advance that a larger tranche is fixed if a defined event occurs, such as the price falling to a budget level or the estimated probability of a large rise over your horizon exceeding a threshold you set.
  4. Ceiling: never fix more than the volume you are confident of buying.

Pre-agreeing the rules matters more than the exact percentages. It stops the decision from being made under pressure on the day of a price spike. How to set the percentages is covered in how much of our annual copper volume should we hedge, and the instruments for doing it in how a mid-sized manufacturer can hedge copper price risk without a trading desk.

Frequently asked questions

Is now a good time to buy copper for 2027?

No one can say reliably. Prices are near record levels, but credible forecasts for 2027 range from below today's level to around US$15,400/t. The better question is how much of your 2027 exposure you can afford to leave open, given your pass-through ability and margins.

Will copper prices fall in 2027?

Some forecasters expect that, citing a refined surplus and recovering mine supply; others expect higher prices on supply deficits outside the US. Treat any single forecast as one scenario, and plan for a range.

Can I lock in 2027 copper prices with my supplier rather than a bank?

Often, yes. Many rod, wire and cable suppliers will fix metal prices for future deliveries, usually against a firm volume commitment. Ask for the metal element to be quoted against a named LME reference so you can compare it with the forward curve.

Sources

Next step

Whichever mix you choose, the decision gets easier when you can put a number on how likely a damaging move is over the months you are buying for, and when that number has a track record you can check. If you want to see how probability estimates for LME copper over defined horizons could feed into your 2027 fixing plan, MetalAlert is built for exactly that question.

Book a walkthrough Get early access
← All posts MetalAlert home